Know which site is slipping, and which package.

A program is many sites, and a site is many work packages that depend on each other. AnantState tracks each level against its plan, so the slip is visible where it starts.

In plain termsSee schedule pressure at the package, not just the program.

What a program is managed through

An example of how a program breaks down.

Pressure shows up at a package and rolls up to a site and a program. Tracking each level separately is what lets the platform say which one is slipping, and what else the slip touches.

What a construction program is managed through · an example

  1. Programthe top of the hierarchy
  2. Site Aunder Program
  3. Site Bunder Program
  4. Groundworksunder Site A
  5. Structureunder Site A
  6. Fit-outunder Site B
  7. Servicesunder Site B
A program breaks into sites and work packages, and each level carries its own schedule and cost pressure, so the platform can say which site and which package is slipping.

Where the delay comes from

  • A late delivery or a piece of rework on one package pushes the packages that follow it, and the program report shows the effect weeks later.
  • Re-sequencing and expediting are priced in the head of the person making the call, with nothing beside the cost of delay.
  • Decisions on a delayed site are explained at the end of the project, when the reasons are hard to recover.

What moves on a site

StateBaseline driversUnexpected drivers
Schedule pressureThe plan, work sequence, crew availabilityWeather, late delivery, rework
Cost postureBudget, rates, scopeScope change, price movement
Supply readinessOrder lead times, delivery planA supplier delay, a shortage
Plant conditionHours, service intervalBreakdown

A worked example

Twenty-five sites, with re-sequencing on the five under most pressure.

Round, illustrative figures for sites: they show the arithmetic, leave out the subscription, and are for you to change in the calculator.

InputValueWhat it stands for
Sites in scope25Everything the team is responsible for
Value at stake per one$120,000Delay and rework cost on one site over the horizon
Cost of the action per one$6,000Re-sequencing work packages or expediting a delivery
Share acted on20%The sites with the most schedule pressure: 5 of 25
Modeled, USDPessimisticExpectedOptimistic
Share of value at stake avoided8%18%30%
Cost to act, in total$30,000$30,000$30,000
Avoided loss$48,000$108,000$180,000
Net position$18,000$78,000$150,000

Break-even is 5.0%: each action costs $6,000 against $120,000 at stake, so it has to avoid that share of the loss to pay for itself.

What exists today

Construction exists as catalog templates. It is not a live simulated program.

Bring a program that slipped

Give us a sample of site and delivery events. We will show where the slip was visible before the report.