Know which site is slipping, and which package.
A program is many sites, and a site is many work packages that depend on each other. AnantState tracks each level against its plan, so the slip is visible where it starts.
In plain termsSee schedule pressure at the package, not just the program.
What a program is managed through
An example of how a program breaks down.
Pressure shows up at a package and rolls up to a site and a program. Tracking each level separately is what lets the platform say which one is slipping, and what else the slip touches.
What a construction program is managed through · an example
- Programthe top of the hierarchy
- Site Aunder Program
- Site Bunder Program
- Groundworksunder Site A
- Structureunder Site A
- Fit-outunder Site B
- Servicesunder Site B
Where the delay comes from
- A late delivery or a piece of rework on one package pushes the packages that follow it, and the program report shows the effect weeks later.
- Re-sequencing and expediting are priced in the head of the person making the call, with nothing beside the cost of delay.
- Decisions on a delayed site are explained at the end of the project, when the reasons are hard to recover.
What moves on a site
| State | Baseline drivers | Unexpected drivers |
|---|---|---|
| Schedule pressure | The plan, work sequence, crew availability | Weather, late delivery, rework |
| Cost posture | Budget, rates, scope | Scope change, price movement |
| Supply readiness | Order lead times, delivery plan | A supplier delay, a shortage |
| Plant condition | Hours, service interval | Breakdown |
A worked example
Twenty-five sites, with re-sequencing on the five under most pressure.
Round, illustrative figures for sites: they show the arithmetic, leave out the subscription, and are for you to change in the calculator.
| Input | Value | What it stands for |
|---|---|---|
| Sites in scope | 25 | Everything the team is responsible for |
| Value at stake per one | $120,000 | Delay and rework cost on one site over the horizon |
| Cost of the action per one | $6,000 | Re-sequencing work packages or expediting a delivery |
| Share acted on | 20% | The sites with the most schedule pressure: 5 of 25 |
| Modeled, USD | Pessimistic | Expected | Optimistic |
|---|---|---|---|
| Share of value at stake avoided | 8% | 18% | 30% |
| Cost to act, in total | $30,000 | $30,000 | $30,000 |
| Avoided loss | $48,000 | $108,000 | $180,000 |
| Net position | $18,000 | $78,000 | $150,000 |
Break-even is 5.0%: each action costs $6,000 against $120,000 at stake, so it has to avoid that share of the loss to pay for itself.
What exists today
Construction exists as catalog templates. It is not a live simulated program.
Bring a program that slipped
Give us a sample of site and delivery events. We will show where the slip was visible before the report.