Which routes will the delay reach?
A late hub does not stay a late hub. AnantState tracks each route, vehicle and depot, and shows how pressure on one reaches the others, so you act on the routes the delay will touch.
In plain termsSee how a delay spreads before it reaches the customer.
How delay spreads along routes
An illustration of one hub’s delay and the routes that depend on it.
The entities are the shipments, routes, vehicles, depots, driver shifts and delivery windows an operation runs through. They are independent on a map and coupled through the network, so the useful view is the connections.
How delay spreads along routes · illustrative
- North hublinked to Route 12, Route 18, Depot 2
- South hublinked to Route 24, Route 31
- Depot 2linked to North hub, Route 24
- Route 12linked to North hub
- Route 18linked to North hub
- Route 24linked to Depot 2, South hub
- Route 31linked to South hub
A worked example
Two hundred and fifty routes, and early action on the fifty under most pressure.
Round, illustrative figures for routes: they show the arithmetic, leave out the subscription, and are for you to change in the calculator.
| Input | Value | What it stands for |
|---|---|---|
| Routes in scope | 250 | Everything the team is responsible for |
| Value at stake per one | $3,500 | Late-delivery penalties and re-delivery cost on one route |
| Cost of the action per one | $120 | Re-sequencing stops or adding capacity to the route |
| Share acted on | 20% | The routes under the most pressure: 50 of 250 |
| Modeled, USD | Pessimistic | Expected | Optimistic |
|---|---|---|---|
| Share of value at stake avoided | 10% | 25% | 40% |
| Cost to act, in total | $6,000 | $6,000 | $6,000 |
| Avoided loss | $17,500 | $43,750 | $70,000 |
| Net position | $11,500 | $37,750 | $64,000 |
Break-even is 3.4%: each action costs $120 against $3,500 at stake, so it has to avoid that share of the loss to pay for itself.
What moves on a route
| State | Baseline drivers | Unexpected drivers |
|---|---|---|
| On-time posture | Schedule, traffic pattern, load | Breakdown, weather event |
| Capacity pressure | Bookings, shift plan | A demand spike, absence |
| Asset condition | Mileage, service interval | Component failure |
| Delivery-window risk | Promised windows, stop sequence | Cascading delay from an earlier leg |
Where it goes wrong today
- Delay is managed route by route, so the routes a late hub is about to affect are found when they are already late.
- Re-sequencing or adding capacity has no price beside it, so the choice is made on instinct under time pressure.
- Penalty and re-delivery costs surface in a monthly review, long after the decision that caused them.
What exists today
Transport and logistics exists as catalog templates (the catalog carries order to fulfill). It is not a live simulated network.
Bring a network with a bad week
Give us a sample of route and delivery events. We will show where pressure was building before the first late delivery.